I thought today I'd reveal all the bathrooms. There are actually 3 full bathrooms and one 1/2 bath.
Let's start with the 1/2.
This bathroom is located right off the current laundry room and is tucked away in a corner. It has a sliding door and is super tiny.
Here is the kid's bathroom. I laughed out loud the first time I saw the sock. It looks just like some guys foot coming through the wall and I found it so funny. Clearly we need some tile work done. I don't hate the tile on the floor, but I don't love it. We also need a toilet put in.
Next we have the Master Bathroom. There isn't a whole lot I like about this bathroom. Since there is a ton of things we have to do to the house before we move in, a lot of what will be done to this room will be cosmetic. The good thing is, anything, will make it better.
There you have it!! All the bathrooms in the house. As we start to work on each one I will do posts on the plans I have for the space and why I decided to do certain things now and certain things later.
I'm meeting with a few more contractors this week and just finishing up gathering all of my bids and then we will be ready to start rolling. I will be glad to finally see things start changing.
Seems like it's going to be a tough road, Meg! I can see that there are still a lot of work to be done, and I'm sure you already have a budget in mind. The renovations might cost you a bit, but it's certainly worth every penny. At any rate, I hope you have fun in the process. All the best to you!
ReplyDeleteGrady Schwartz @ iDesign
The master bathroom actually looks pretty great. It's going to need a bit of redesigning, but the layout doesn't need much work, in my opinion. In any case, I'd love to see how far you've gotten into renovating. Make sure to keep us posted, Meg. Thanks for sharing that! All the best to you!
ReplyDeleteJohnny Hernandez @ Ripple Systems